Rooftop solar array at sunrise

Rooftop solar · zero investment

Stop renting your electricity.

Government subsidy covers most of the upfront cost. What is left is financed, and your monthly saving covers the instalment — so the roof pays for itself while you keep the lights on.

MNRE-registered · ISO 9001 certified
0 MWp
Commissioned
0+
Rooftops
0 yrs
In the field

Book a free site survey

And find out what you could claim — up to ₹78,000 in subsidy.

No obligation. We will not pass your number on.

  • Rooftop solar
  • Ground-mount solar
  • Net metering
  • PM Surya Ghar subsidy
  • Generation O&M
  • Telecom towers
  • STP & water treatment

Why us

Solar is a twenty-five year relationship.

Most of what goes wrong with rooftop solar in India goes wrong after the installer has been paid. Here is what we hold ourselves to.

Generation guarantee

The proposal carries an annual generation number, and the O&M contract reports against it every month. Fall short and we make it good.

No middlemen

Survey, design, approvals, subsidy filing and installation are all ours. You deal with one team and one invoice, start to finish.

Built for Indian weather

Galvanised structures engineered to IS 875 wind loading, so the array holds through storm season on a rooftop, not just on paper.

Service that answers

Scheduled cleaning, string-level monitoring and a named engineer for your site. Faults are our problem, not yours.

Zero investment

The bill you already pay, pointed somewhere useful.

The subsidy covers most of the downpayment. The rest is financed, and the saving on your electricity bill goes toward the instalment. When the loan finishes, the generation does not.

  1. 01Subsidy knocks up to ₹78,000 off the price
  2. 02The balance is financed over 3 to 7 years
  3. 03Your monthly saving goes toward the instalment
  4. 04After the tenure, the power is simply free

System size

Tenure

You save

₹4,800

every month

You pay

₹4,137

EMI for 60 months

Your saving covers the instalment with ₹663 left over each month — and the whole saving is yours once the 60 months are up.

Indicative only. Assumes ₹1.97 L financed after a ₹78,000 subsidy at 9.5% a year, and a tariff of ₹8/unit. Your actual rate, tariff and shading will change these numbers — the site survey gives you real ones.

Savings calculator

What would your roof save?

Move the slider to your average monthly electricity bill. We size the system to what you actually consume — not to the largest array your roof could hold.

₹6,000
₹1,000₹1.00 L+

Recommended system

6.5 kWp

About 520 sq ft of roof

Monthly saving

₹6,000

780 units generated

Net cost after subsidy

₹2.79 L

₹78,000 subsidy applied

Payback

3.9 yr

Then 21 years of free power

Estimated saving over 25 years

₹27.97 L

Get an exact quote

Indicative only. Based on ₹8/unit, 4 units per kWp per day and ₹55,000 per kWp installed. Your actual tariff, shading, roof and DISCOM policy will change these figures — a site survey gives you the real number.

Which roof do you have?

Every roof mounts differently.

RCC rooftop

RCC rooftop

Flat concrete roof on a house, apartment block or institution.

Mounting
Elevated galvanised structure, ballasted or chemically anchored
Capacity per 1,000 sq ft
10 – 12 kWp

The structure is raised so the roof stays usable underneath. No slab drilling where a ballasted design carries the wind load.

How it happens

Survey to switched on, in about eight weeks.

  1. Day 1–2

    Site survey

    We measure the roof, check the structure, study shadows across the day and read your last twelve months of bills.

  2. Day 3–5

    Design & proposal

    Layout, string sizing and a single-line diagram, with a firm price and a generation estimate you can hold us to.

  3. Week 2–5

    Approvals & subsidy

    Net-metering application with the DISCOM, CEIG clearance where required, and the PM Surya Ghar subsidy filing. We file, follow up and close it.

  4. Week 5–6

    Installation

    Structure, modules, inverter, cabling and earthing. A typical residential rooftop is finished in three to five days on site.

  5. Week 6–8

    Meter & commissioning

    DISCOM installs the bi-directional meter, we synchronise and test, and you get the baseline generation report.

  6. Ongoing

    Generation & O&M

    Scheduled cleaning, string-level monitoring and a yearly performance report. Faults are our problem, not yours.

Subsidy & net metering

Up to ₹78,000 back from the government.

Under PM Surya Ghar, a residential rooftop system draws a central subsidy paid straight into your bank account. It only releases through a registered installer, and the filing is ours to do.

  1. 01

    Register

    Apply on the National Portal with your DISCOM, consumer number and the sanctioned load.

  2. 02

    Get feasibility approval

    The DISCOM confirms your connection can take the proposed system. Usually a few days.

  3. 03

    Install through a registered vendor

    The subsidy only releases against an empanelled installer. We are registered, so this is already handled.

  4. 04

    Net meter & inspection

    The DISCOM fits a bi-directional meter and inspects the installation.

  5. 05

    Subsidy credited

    Once the commissioning certificate is generated, the amount lands in your bank account, typically within 30 days.

SunPanelsInverterMeterHomeGridsurplus

What net metering actually does

Your meter runs both ways. During the day the array feeds the house first and pushes the surplus onto the grid; at night you draw back from the grid. At the end of the billing cycle you pay only for the net difference, and unused export usually carries forward as credit.

  • Daytime surplus is exported and credited, not wasted
  • Night-time draw comes off those credits first
  • Credits typically carry forward through the settlement year
  • Sanctioned load and roof area cap the system size, not your appetite

Finance & equipment

You do not have to pay for it all at once.

Most customers finance the balance after subsidy. Loans for rooftop solar are available from public-sector and private banks under the PM Surya Ghar scheme, typically at rates well below an ordinary personal loan, and we help you put the application together.

Loans available from

  • State Bank of IndiaSurya Ghar
  • Bank of BarodaSurya Ghar
  • Punjab National BankSurya Ghar
  • Union Bank of IndiaSurya Ghar
  • Canara BankSurya Ghar
  • HDFC BankRetail loan
  • ICICI BankRetail loan
  • Axis BankRetail loan

We are tied up with these lenders. Rates, eligibility and the sanction itself remain the bank's decision — we assemble the application and follow it through.

We build with

  • Tata Power SolarModules
  • Adani SolarModules
  • WaareeModules
  • Vikram SolarModules
  • LuminousInverters
  • GrowattInverters
  • SungrowInverters
  • PolycabCabling

Tier-1 modules and inverters. The exact make is named in your proposal and never substituted on site.

Watch

See what a Next Energy install looks like

From the first site survey to the day the meter runs backwards — the whole job, on a real roof.

What you actually get

The paperwork behind the panels.

Quotes are easy to compare on price and hard to compare on what is in them. This is ours, written down.

Solar modules — performance
25 years
Solar modules — product
12 years
Inverter
5–10 years
Mounting structure
10 years
Workmanship
5 years
Free O&M after commissioning
5 years

Warranty terms are the manufacturer’s and are handed over with the commissioning documents, in your name.

A real-world 3 kWp rooftop

Before solar₹4,200
After solar₹410
Saved every month₹3,790(90%)

Indore household, 3 kWp rooftop. The amount left is the fixed charge the DISCOM levies regardless of consumption — solar does not remove that part.

We build with

  • Waareemodules
  • Adani Solarmodules
  • Vikram Solarmodules
  • Growattinverters
  • Sungrowinverters
  • Polycabcabling

Tier-1 modules and inverters only. The exact make is named in your proposal — never substituted on site.

What you get from us

Promises we can be held to.

Reported monthly

A generation number, in writing

The proposal states the units your system should produce in a year, and the monthly report measures against it. If it falls short, finding out why is our job.

No middlemen

One team, start to finish

The crew that surveys your roof is the crew that installs on it. No subcontracted labour, no handover to a stranger halfway through.

Filed and followed up

The paperwork is ours

Net metering, DISCOM liaison and the PM Surya Ghar subsidy filing. You sign where needed; we chase the file.

Where we work — across India

  • Indore
  • Bhopal
  • Ujjain
  • Gwalior
  • Jabalpur
  • Dewas
  • Ratlam
  • Sagar
  • Pune
  • Nagpur
  • Ahmedabad
  • Jaipur
  • Delhi NCR
  • Hyderabad
  • Bengaluru

Questions

The things everyone asks.

Still unsure about something? Call us and talk to the person who would actually survey your roof.

Talk to an engineer
What does a rooftop solar system cost?

A residential system runs roughly ₹55,000 per kWp installed before subsidy, so a typical 3 kWp home system is around ₹1.65 lakh gross. After the PM Surya Ghar subsidy of up to ₹78,000 the net comes down sharply. The exact figure depends on your roof, the structure needed and the modules chosen — the site survey gives you a firm price.

Can I really go solar with no money down?

In most cases, close to it. The central subsidy covers a large part of the upfront amount, and the balance can be financed so the monthly instalment sits near — often below — what you were already paying the electricity board. You are swapping a bill you will pay forever for an instalment that ends.

How many air conditioners can a 5 kWp system run?

A 5 kWp array generates roughly 600 units a month, which comfortably covers two 1.5-ton inverter ACs used normally alongside the usual household load. What matters more than the panel count is your sanctioned load and how much you run them at night, because night-time use draws from the grid against your net-metering credits.

What happens on cloudy days and at night?

You stay connected to the grid. During the day the array feeds the house first and exports the surplus; at night and in monsoon you draw back against the credits that surplus earned. You are billed only on the net difference, so a cloudy week is smoothed out over the billing cycle rather than leaving you short.

How much roof do I need?

Roughly 80 square feet per kWp on an RCC roof, so a 3 kWp system needs about 240 square feet of genuinely shadow-free area. Ground-mount needs more because rows are spaced apart to avoid shading each other.

How long does the whole process take?

About eight weeks end to end for a typical home. The installation itself is three to five days; most of the calendar goes on DISCOM approvals and the net-metering process, which we file and follow up on your behalf.

What maintenance does it need?

Cleaning, mainly. Dust on the modules is the single biggest cause of lost generation in India. Our O&M contract covers scheduled cleaning, inverter servicing and string-level monitoring, so a dead string is spotted from the dashboard rather than from your bill three months later.

What if I sell the house?

The system stays with the property and transfers to the new owner, along with the remaining module and inverter warranties. A commissioned solar system is generally treated as adding to the property's value.

Also from Next Energy

Two more lines of infrastructure.

The same crews, engineering and compliance discipline, applied to telecom and water.

Start a project

Tell us what you need built.

Send us the site details and the scope. We will come back with a feasibility view and an indicative timeline.

CallWhatsApp